Tokushima > Naruto, Tokushima City > Awa Shirasagi Ohashi Bridge

Awa Shirasagi Ohashi Bridge

An Impressive Long-Span Bridge Designed in Harmony with Nature

Awa Shirasagi Ohashi Bridge is a landmark in Tokushima City, Tokushima Prefecture, spanning the Yoshino River approximately 1.8 kilometers upstream from its mouth. Connecting Sumiyoshi 6-chome on the right bank with Tsurushima in Kawauchi-cho on the left bank, the bridge was constructed as part of the city’s eastern ring-road development plan.

Forming part of Tokushima Prefectural Route 29, the Tokushima Ring Road, the bridge has a main span structure extending across the river and a total bridge length of 1,291 meters. When it opened, it was the longest road bridge over a river in Shikoku, making it a notable engineering achievement as well as an important piece of urban infrastructure.

Beyond its impressive scale, Awa Shirasagi Ohashi is particularly remarkable for its environmentally conscious design. The bridge crosses the Yoshino River estuary, an important tidal-flat habitat for wildlife and migratory birds. Its innovative structure was developed to reduce the impact on this sensitive natural environment while improving transportation around Tokushima City.

Bridge Naming and Opening

For many years, the bridge was commonly known as the Higashi Kanjō Ohashi, or Eastern Ring-Road Bridge. As construction neared completion, a public naming competition was held to select its official name. On February 13, 2012, it was named Awa Shirasagi Ohashi, meaning the Awa White Heron Bridge. The bridge officially opened on April 25 of the same year.

The bridge’s technical innovation and public value were recognized through several awards. It received the 2011 Zenken Award, which honors outstanding achievements in civil engineering and construction, as well as the 2012 Tanaka Prize in the Works category from the Japan Society of Civil Engineers.

Innovative Engineering and Design

The Unique Cable Egret Structure

One of the bridge’s most distinctive features is its innovative Cable Egret system, which combines the principles of a cable-stayed bridge with a cable-truss structure. This approach was developed to span the estuary’s tidal flats while minimizing the number of piers placed in ecologically sensitive areas.

By increasing the span between supports and keeping the towers relatively low, engineers were able to reduce the structure’s footprint across the tidal flats. The cables are arranged in parallel in a way that makes them appear almost like a single line when viewed from the side, giving the bridge a streamlined appearance.

The bridge’s design reflects the importance of balancing infrastructure development with environmental protection. Rather than simply building a conventional bridge across the river, engineers sought a solution that would maintain transportation efficiency while limiting disruption to the surrounding ecosystem.

Low-Profile Towers

The main towers in the tidal-flat section stand approximately 29.5 meters high. Their relatively low profile, combined with the carefully arranged cables, was intended to reduce potential interference with birds flying through the estuary. The name of the engineering system also evokes the white herons associated with the river environment.

Environmentally Sensitive Night Lighting

Environmental considerations extend to the bridge’s nighttime illumination. Instead of relying on bright lights that could spill into the surrounding landscape, the bridge uses lighting integrated into the inner sides of its railings. This low-positioned system illuminates the pedestrian areas while directing light away from the exterior.

By limiting light pollution, the design helps reduce potential disturbance to migratory birds and other wildlife. The lighting arrangement also allows the bridge to remain functional and safe at night while maintaining a closer relationship with the natural surroundings.

A Landmark for Local Residents

Since opening, Awa Shirasagi Ohashi has become a recognizable landmark near the mouth of the Yoshino River. It provides an important connection between different parts of Tokushima City and contributes to the wider ring-road network.

The bridge also offers opportunities to enjoy the river landscape. Pedestrians and cyclists can experience the broad waters of the Yoshino River and the open scenery of its estuary, making the bridge more than just a transportation route. Its combination of practical function, impressive scale, and environmental awareness has helped make it a familiar part of everyday life in Tokushima.

Traffic Improvements and Urban Connectivity

Addressing Congestion in Tokushima City

One of the main reasons for constructing Awa Shirasagi Ohashi was to ease chronic traffic congestion in central Tokushima. By providing another route across the Yoshino River, the bridge was intended to distribute traffic more effectively and improve connections around the city.

However, congestion remained a challenge when the bridge first opened. At both the northern and southern ends, roads descending from the bridge narrowed from two lanes to one, restricting traffic flow and preventing the full benefits of the new crossing from being realized.

Additional Exit Ramps

To improve traffic distribution, additional ramps were constructed. On March 20, 2015, the Joto Down Ramp, leading toward Joto-cho, and the Atake Down Ramp, leading toward Atake, opened to traffic. These connections gave drivers more options for leaving the bridge and helped relieve congestion in the surrounding road network.

As of September 2015, however, the entrance ramp from the Suehiro Ohashi Bridge area was still under construction, and the exit toward Tokushima Prefectural Route 189, the Okinosu Wharf Line, had not yet opened. These outstanding works meant that the full improvement of traffic circulation remained an ongoing challenge at that time.

Protecting the Yoshino River Estuary

A Valuable Tidal-Flat Ecosystem

The Yoshino River estuary contains extensive tidal flats that support a variety of wildlife, including the endangered fiddler crab, known in Japanese as shio-maneki, as well as migratory birds that visit the area seasonally. The proposed bridge route therefore raised concerns about the possible effects of construction on this ecologically valuable habitat.

The project generated debate among local residents and environmental protection groups. While many recognized the need to address Tokushima’s traffic congestion, others questioned whether a major bridge should be built across an area so important to wildlife.

Considering an Underwater Tunnel

An underwater tunnel was initially considered as an alternative that could avoid direct construction across the tidal flats. However, the anticipated increase in construction costs and difficulties in coordinating the tunnel with the surrounding road network made this option less practical. The bridge plan was ultimately selected, with extensive efforts made to reduce its environmental impact.

The resulting design limited the number of piers in the tidal-flat area and used longer spans to avoid disturbing as much of the habitat as possible. These measures became central to the bridge’s engineering concept.

Construction Methods to Reduce Environmental Impact

Environmental precautions were also taken during construction. Rather than building temporary trestle structures across the tidal flats, construction crews used floating work barges. This approach helped avoid direct disturbance to the tidal-flat surface and reduced the footprint of the construction process.

Through design modifications, careful lighting, and alternative construction methods, the project sought to balance the demands of modern transportation with the need to preserve the Yoshino River estuary. Although concerns about the impact of infrastructure on wildlife remained an important part of the debate, environmental protection was a central consideration throughout the project.

Technical Specifications

Bridge Structure and Dimensions

Bridge length: 1,291 meters.

Total project bridge extension: Approximately 1,380 meters.

Width: Approximately 26.3 to 32.3 meters, with the greater width at the main tower section.

Number of traffic lanes: Four lanes, with pedestrian walkways on both sides.

Design speed: 60 km/h.

Road classification: Class 4, Grade 1.

General bridge section: Approximately 716 meters, using a rigid-frame plate-girder structure.

Tidal-flat section: Approximately 575 meters, using the Cable Egret plate-girder structure.

Planned traffic volume: Approximately 25,000 vehicles per day.

Project authority: Tokushima Prefecture.

Project cost: Approximately ¥25 billion.

Project period: Fiscal years 2000–2012. Construction began on December 6, 2003.

Discover the Yoshino River Landscape

Awa Shirasagi Ohashi offers a striking example of how large-scale infrastructure can be designed with the natural environment in mind. Its long span, distinctive cable arrangement, and carefully controlled lighting make it an unusual bridge, while its location near the Yoshino River estuary connects visitors with one of Tokushima’s important natural landscapes.

Whether viewed as an engineering landmark, a key part of Tokushima’s transportation network, or a crossing that reflects the ongoing challenge of balancing development with conservation, the bridge provides an interesting perspective on the relationship between modern urban life and the natural world.